The Remediation, Rehabilitation and Restoration of the Spruit, Krom, Leeu and Hugo’s-Palmiet Rivers, Wellington & Paarl, Drakenstein Municipality
As a result of years of flood challenges, the beds and banks of the Spruit, Krom, Leeu and Hugo’s-Palmiet rivers, the banks as well as erosion protection structures have eroded and/or collapsed. Aurecon was appointed to investigate the condition of the four rivers from an environmental and engineering perspective within Drakenstein Municipality.
Current Project Phase
Resulting from the public engagement process that was undertaken for the proposed remediation, rehabilitation and restoration of the Spruit, Krom, Leeu and Hugos-Palmiet rivers located within the Drakenstein Municipality, a report has been written and has been submitted to the Drakenstein Municipality for their consideration. The Report highlights the key findings from the engagement process, the information of which will be used to inform the Municipality’s discussion in terms of the way forward for the project
Project Documents
Documents Are in Adobe Acrobat (pdf) or Compressed (zip) formats
Public Engagement Report
Annexure A: Engineering Summary Report: English , Afrikaans
Annexure A: Letter to I&APs: English , Afrikaans
Annexure A: Response Forms: English , Afrikaans
Annexure A: Posters: English , Afrikaans , Posters 15 March 2010
Annexure A: Adverts: Paarl Post , Die Burger , Press Release
Annexure B: Focus Group meeting Presentation on 13 April 2010
Annexure B: Focus Group meeting Notes on 13 April 2010: Eng , Afr
Annexure C: Public Meeting meeting notes on 4 May 2010: Eng , Afr
Annexure C: Public Meeting Presentation Eng: Part 1 , Part 2 , Part 3
Annexure C: Public Meeting Presentation Afr: Part 1 , Part 2 , Part 3
Annexure C: I&APs Consent Form: Eng , Afr
Annexure D: I&APs comments: Comments 1 - 10 , Comments 11 - 20 , Comments 21 - 30 , Comments 31 - 37
Annexure D: Comments Report
Annexure D: Completed Consent Forms: Spruit River 1 , Spruit River 2 , Spruit River 3 , Krom River , Leeu River , General I&APs
Annexure D: I&APs database: Spruit River , Krom River , Leeu River , Hugos Palmiet River , General database
Annexure E: Authority Meeting Notes
Annexure E: Letters to task team
Environmental Management Plan: Part 1 , Part 2 , Part 3 , Part 4 , Part 5 , Part 6
Figures: Figure 1 , Figure 2-1 , Figure 2-3 , Figure 2-4 , Figure 2-5 , Figure 2-7
Engineering Main Report : Part 1 , Part 2
Annexure A: Hydrology