Project Status:

In Progress

Contacts

Aurecon Cape Town

Address: P.O. Box 494, Cape Town, 8000

Tel: (021) 481 2400

Fax: (021) 424 5588

Contact Persons

Karen Shippey

Tamara North

Franci Gresse
Comment on this project online

The Remediation, Rehabilitation and Restoration of the Spruit, Krom, Leeu and Hugo’s-Palmiet Rivers, Wellington & Paarl, Drakenstein Municipality

As a result of years of flood challenges, the beds and banks of the Spruit, Krom, Leeu and Hugo’s-Palmiet rivers, the banks as well as erosion protection structures have eroded and/or collapsed.   Aurecon was appointed to investigate the condition of the four rivers from an environmental and engineering perspective within Drakenstein Municipality. 

 

 

 

Current Project Phase

Resulting from the public engagement process that was undertaken for the proposed remediation, rehabilitation and restoration of the Spruit, Krom, Leeu and Hugos-Palmiet rivers located within the Drakenstein Municipality, a report has been written and has been submitted to the Drakenstein Municipality for their consideration.  The Report highlights the key findings from the engagement process, the information of which will be used to inform the Municipality’s discussion in terms of the way forward for the project

Comments for: The Remediation, Rehabilitation and Restoration of the Spruit, Krom, Leeu and Hugo’s-Palmiet Rivers, Wellington & Paarl, Drakenstein Municipality
Title:Dr. Mrs. Ms. Mr. Other
First Name Surname:
Organisation (If applicable)Email Address:
Postal Address:Town/Suburb:
Postcode:
Phone Number:Cell Number:Fax Number:
Preferred contact method: Postal Email Fax

Do you have any direct interest in the approval or refusal of the proposed project by the environmental authorities?

Business/FinancialPersonal
Competing business: YesNo Neighbour to proposed project site:Yes
Neighbouring business: YesNo Other(please explain):YesNo
Potential employment opportunities: YesNo
Service provision (machinery etc) :YesNo

Register on the database to receive future project notifications?: Yes No
Please list any comments, issues or concerns that you may have:

Please enter the anti spam code below:
verification code

Project Documents

Documents Are in Adobe Acrobat (pdf) or Compressed (zip) formats

Public Engagement Report

Annexure A: Engineering Summary Report: English , Afrikaans

Annexure A: Letter to I&APs: English , Afrikaans

Annexure A: Response Forms: English , Afrikaans

Annexure A: Posters:  English , Afrikaans  , Posters 15 March 2010

Annexure A: Adverts: Paarl Post , Die Burger , Press Release

Annexure B: Focus Group meeting Presentation on 13 April 2010

Annexure B: Focus Group meeting Notes on 13 April 2010:  Eng , Afr

Annexure C: Public Meeting meeting notes on 4 May 2010: Eng , Afr

Annexure C: Public Meeting Presentation Eng: Part 1 , Part 2 , Part 3

Annexure C: Public Meeting Presentation Afr: Part 1 , Part 2 , Part 3

Annexure C: I&APs Consent Form:  Eng , Afr

Annexure D: I&APs comments: Comments 1 - 10 , Comments 11 - 20 , Comments 21 - 30  , Comments 31 - 37

Annexure D: Comments Report

Annexure D: Completed Consent Forms: Spruit River 1 , Spruit River 2 , Spruit River 3 , Krom River , Leeu River  , General I&APs

Annexure D: I&APs database: Spruit River , Krom River , Leeu River , Hugos Palmiet River , General database

 Annexure E: Authority Meeting Notes

Annexure E: Letters to task team

Environmental Management Plan: Part 1 , Part 2 , Part 3 , Part 4 , Part 5 , Part 6

Figures: Figure 1 , Figure 2-1Figure 2-3 , Figure 2-4 , Figure 2-5 , Figure 2-7

Engineering Main Report : Part 1 , Part 2

Annexure A: Hydrology