Proposed Construction of a Link Road Between Main Road and Mountain Drive in Hermanus

The Overstrand Municipality proposes to construct a road and associated infrastructure, which will link Main Road and Mountain Drive, in the vicinity of Hermanus. The proposed road would be approximately 400 m long and 16 m wide (including the road reserve). Furthermore, a 1.8 m wide gravel sidewalk would be constructed, and extend along either side of the road. The proposed activity would also include the installation of approximately 95 m of stormwater pipelines and 140 m of open drains. The proposed stormwater pipelines would vary from 375 mm to 450 mm in diameter. In addition, the proposed activity would also include the construction of a stormwater headwall, a manholes and a number of catchpits.

Current Project Phase

The Final BAR has been made available to the public for a 21 day comment period. Copies of the report have been lodged at Hermanus Public Library and on the Aurecon South Africa (Pty) Ltd website (www.aurecongroup.com) (select South Africa, Public Participation link). As an I&AP, you are invited to review and comment on the Final BAR. Should you have any comments, issues or concerns regarding the proposed project or the findings of the Final BAR please provide your comments in writing to the D: EADP on or before Monday, 14 June 2010, at the following contact details:

 

Ms Natasha Bieding

Department of Environmental Affairs and Development Planning: Overberg Region B1

Directorate: Integrated Environmental Management

Private Bag X9086

Cape Town

8000

Fax: 021 483 4372, or

Email: nbieding@pgwc.gov.za

 

Please ensure that all correspondence submitted to the D: EA&DP contains the reference number noted above, and is copied to Aurecon for our records. We thank you for your participation thus far in the current environmental process. You will be notified when the D: EA&DP has reached a decision regarding the environmental authorisation of the proposed project.

 

 

 

Comments for: Proposed Construction of a Link Road Between Main Road and Mountain Drive in Hermanus
Title:Dr. Mrs. Ms. Mr. Other
First Name Surname:
Organisation (If applicable)Email Address:
Postal Address:Town/Suburb:
Postcode:
Phone Number:Cell Number:Fax Number:
Preferred contact method: Postal Email Fax

Do you have any direct interest in the approval or refusal of the proposed project by the environmental authorities?

Business/FinancialPersonal
Competing business: YesNo Neighbour to proposed project site:Yes
Neighbouring business: YesNo Other(please explain):YesNo
Potential employment opportunities: YesNo
Service provision (machinery etc) :YesNo

Register on the database to receive future project notifications?: Yes No
Please list any comments, issues or concerns that you may have:

Please enter the anti spam code below:
verification code

Project Documents

Documents Are in Adobe Acrobat (pdf) or Compressed (zip) formats

Final Basic Assessment Report

Application Form

Appendix A: Locality Map

Appendix B: Site Layout

Appendix C: Owners Consent

Appendix D.1: Photoplate 1

Appendix D.2: Photoplate 2

 Appendix E: Comments received on DBAR , Comments & Response Report ,  I&APs database , Letters to I&APs , Letters to State Departments , Advert , Site Notices

 Appendix F: HWC ROD

 Appendix G.1: Archaeological Impact Assessment

Appendix G.2: Notice of Intent to Develop

Appendix G.3: Botanical Assessment

 

 

Appendix I: Assessment Methodology

 Appendix J: Letter to I&APs and state departments FBAR

Draft Basic Assessment Report

Application Form

Appendix A: Locality Map

Appendix B: Site Layout

Appendix C: Owners Consent

Appendix D.1: Photoplate 1

Appendix D.2: Photoplate 2

 

Appendix E.1: Advert

Appendix E.2: Site Notice

Appendix E.3: I&APs database

Appendix E.4: Letter to I&APs

Appendix E.5: Letters to commenting authorities

 

Appendix F: HWC ROD

 

Appendix G.1: Archaeological Impact Assessment

Appendix G.2: Notice of Intent to Develop

Appendix G.3: Botanical Assessment

 

Appendix H.1: Basic EMP 

Appendix H.2: Life Cycle EMP

Appendix H.3: Acknowledgement of Receipt from DEA&DP

Appendix H.4: CV's for Environmental Consultants

 

Appendix I: Assessment Methodology

Appendix H.1: Basic EMP 

Appendix H.2: Life Cycle EMP Final