ENVIRONMENTAL SERVICES

Public Participation Processes

Project Status:

Open For Comment

Contacts

Aurecon Cape Town

Address: P.O. Box 494, Cape Town, 8000

Tel: (021) 481 2400

Fax: (021) 424 5588

Contact Persons

Michael Mangnall

René Stewart

None
Comment on this project online

Proposed Construction Of Newton Reservoirs, Pumpstation And Pipelines, Paarl, Drakenstein Municipality: Phase 2

The Drakenstein Municipality proposes to increase their assured water supply through the construction of two reservoirs, a pumpstation and water supply pipelines. The proposed activities are in line with the Water Master Plan drafted for the Drakenstein Municipality to upgrade the municipality’s water reticulation system and will supplement the Newton, Wellington and Mbekweni areas. This particular upgrade was divided into two phases. Phase I included the construction of a 400 mm iron ductile pipeline along the eastern border of Jan van Riebeeck Road (R301), extending in a southerly direction for 3 600 m. The Environmental Impact Assessment (EIA) for this pipeline has been undertaken (Reference No. E12/2/3/1-B3/28-0756/08) and the Environmental Authorisation was issued on the 30 June 2009. Phase 2 includes the various components currently being proposed, viz: two reservoirs, a pumpstation and water supply pipelines.

Current Project Phase

The Draft Basic Assessment Report (BAR) for the proposed project was previously lodged in the public domain for comment however the Municipality has added additional components (Pipelines 3 and 4) to the proposed project. The Draft BAR has subsequently been revised with the inclusion of the additional components.

The proposed activity being applied for is Phase 2 of the system upgrade and involves the construction of:

o   Two reservoirs approximately 12 Ml each in size, on the Roggeland Farm;

o   A pumpstation located on the corner of Bo-Dal Road and a private access road; and

o   Four water pipelines which include the following:

Ø  Pipeline 1: One rising main from the pumpstation to the reservoirs;

Ø  Pipeline 2: One gravity pipeline from the reservoirs to the Phase 1 connection point at the corner of Buitekant Street and the R301;

Ø  Pipeline 3: A pipeline that will connect and extend from an existing pipeline in Champagne Street to the Van Blerk Reservoir; and

Ø  Pipeline 4: A pipeline that will extend from the existing Van Blerk Reservoir to the Con Marine Reservoir.

 

The Revised Draft BAR has been made available to the public for a 40 day comment period. Copies of the report have been lodged at the Paarl Public Library from the 7 July 2010 to the 16 August 2010.

Should you have any comments, issues or concerns regarding the proposed project or findings of the revised DBAR, please provide your comments in writing to Rene Stewart/Michael Mangnall of Aurecon on Tel: (021) 481-2501, Fax: (021) 424-5588 or rene.stewart@af.aurecongroup.com , on or before 16 August 2010.

All comments received and issues raised will be included into the Comments and Response Report, and, where appropriate, will be used to update the Final BAR, which will be submitted to the decision-making authority, the Department of Environmental Affairs and Development Planning (D: EA&DP), for their consideration and decision.  Copies of I&AP comments, and responses to the comments received, will be sent to those who submitted comments. All registered I&APs will be notified when the Final BAR is submitted to D: EA&DP. I&APs will simultaneously be afforded a further 21 days to comment on the Final BAR. Any additional comments received will be collated and submitted to D: EA&DP.

Once DEA&DP has reviewed the Final BAR and are satisfied that it contains sufficient information to make an informed decision, they will issue an Environmental Authorisation. Registered I&APs will be notified of DEA&DPs decision.

 

Comments for: Proposed Construction Of Newton Reservoirs, Pumpstation And Pipelines, Paarl, Drakenstein Municipality: Phase 2
Title:Dr. Mrs. Ms. Mr. Other
First Name Surname:
Organisation (If applicable)Email Address:
Postal Address:Town/Suburb:
Postcode:
Phone Number:Cell Number:Fax Number:
Preferred contact method: Postal Email Fax

Do you have any direct interest in the approval or refusal of the proposed project by the environmental authorities?

Business/FinancialPersonal
Competing business: YesNo Neighbour to proposed project site:Yes
Neighbouring business: YesNo Other(please explain):YesNo
Potential employment opportunities: YesNo
Service provision (machinery etc) :YesNo

Register on the database to receive future project notifications?: Yes No
Please list any comments, issues or concerns that you may have:

Please enter the anti spam code below:
verification code

Project Documents

Documents Are in Adobe Acrobat (pdf) or Compressed (zip) formats

Application Form of Revised Draft BAR

Revised Draft Basic Assessment Report

Appendix A: Locality Plan

Appendix B: Layout Plan (available on request)

Appendix C: Landowner's details , Landowners Consent Form

Appendix D: Photoplates: Pipeline 1& 2 , Pipeline 3 , Pipeline 4

Appendix E1: Summary of Public Participation Process

Appendix E2: Initial I&APs database

Appendix E3: Letter to I&APs re Draft BAR

Appendix E4: Proof of advert

Appendix E3: Text of Eng & Afr Adverts

Appendix E4: Text of Eng & Afr Site Notice

Appendix E5: Photographs of Site Notices

Appendix E6: Report Distribution Record & Proof of Report Delivery

Appendix E7: Letter to DEA&DP re Draft BAR

Appendix E7: Letter from DEA&DP re BAR

Appendix E8: I&APs comments on DBAR

Appendix E9: Comments & Response Report 1

Appendix E10: Revised I&APs database 

Appendix E11: Revised Layout Plan (Available on request)

Appendix E11: Letter to Registered I&APs re revised draft BAR

Appendix E12: Revised Layout Plan (Available on request)

Appendix E12: Letter to new I&APs re revised draft BAR

Appendix E12: Revised I&APs Response Forms: English, Afrikaans

Appendix E13:Text of Eng & Afr Site Notice re revised draft BAR

Appendix E14:Letter to DEA&DP re revised draft BAR

Appendix G: Archaeological Impact Assessment , Notice of Intent to Develop , Visual Mitigation Measures , Proposed development on Aquatic Environment

Appendix H: Life  Cycle EMP , Appendix A~DEADP Acknowledgement Letter , Appendix B~M Mangnall CV , Appendix B~R Stewart CV , Construction EMP

Appendix I: Assessment Methodology